Installation guide

890USE17100 September 2003 81
5
Commissioning an Advantys STB
Island
Overview
Commissioning
the Island
Once the island hardware has been installed and you are sure that the installation
has been properly grounded, you can follow the procedures in this chapter to
commission the island as an operational node on your fieldbus network.
What’s in this
Chapter?
This chapter contains the following topics:
Topic Page
Making Fieldbus and Power Connections 82
Configuring the Island 85
Hot Swapping Advantys STB Modules 88
Fault Detection and Troubleshooting 95