Installation guide
Installation
42
890USE17100 September 2003
Keying Considerations
Overview Along with the inherent keying designed into Advantys STB products and the wise
use of labels, you have the option of using keying pins to assure correct installation
of modules into their assigned bases, and connectors into their assigned
receptacles. Make your keying scheme prior to attaching your I/O bases to the
island’s DIN rail.
In this manual we recommend a keying scheme for base to module connections
only. Keying schemes for connectors are similar. Keys for modules must be ordered
separately (see the Keying Kit Table that follows). PDM Connectors come with a set
of their own keys.
Keying Kit Table Keying pin kits are available for the I/O to base connection, the field wire connection
(for sensor or actuator connections), the 24 VDC connection to the NIM, and the
power connection on the PDM.
Here is a table matching your keying needs with the correct keying kits:
Note: If your scheme includes keying the module to base connections, remove any
break-off pins from the bases before installing them on the DIN rail.
If you want to ... use a key from an ... key
quantity
key the I/O module to a base
connection
STB XMP 7700 module keying pin kit 60
key the field wire connection on the
front of an I/O module
STB XMP 7800 I/O connector keying pin kit 96
key the 24 VDC connection on the
NIM
STB XMP 7800 kit 96
key the PDM power connection STB XMP 7800 kit and an
STB XMP 7810 PDM connector keying kit
96
24