Instructions
www.scheppach.com / service@scheppach.com / +(49)-08223-4002-99 / +(49)-08223-4002-58
24
|
GB
Vacuuming (Fig. I):
-
tion hose port (9). To do so, slide the end
of the suction hose (a) with the two nipples
the two nipples into the recesses. Once
clockwise (B).
Blowing (Fig. J):
-
ing function connection port (13). Slide the
end of the suction hose (a) with the two
nipples into the blowing function connec-
it here.
Installing the metal extension tube (g),
suction hose (a) and nozzles (e / f) (Fig. K)
•
with the bent end of the suction hose
(a).
•
to the other end of the metal extension
tube (g).
• Push the slide piece forwards (A) to
change the length of the metal exten-
sion tube (g). (Fig. L)
• Pull the tube to the desired length (B).
Ensure that the slide lock latches into
place. (Fig. L)
Installing the castors (5) (Fig. D)
• Press the four castors (5) into the holes
in the castor mounts (5a).
Installing the machine head (2) (Fig. E)
• Place the machine head (2) on the
stainless steel container (8). Secure
the machine head (2) with the locking
hooks (4). When installing the machine
head (2), ensure that the locking hooks
Installing the foam lter (b) (Fig. F)
• -
-
valve (14).
Installing the HEPA lter (d) (Fig. G)
Installing the paper lter bag (c) (Fig. H)
•
suction opening in the stainless steel
dispose of the dust collected.
Installing the suction hose (a) (Fig. I)
-
sponding port, depending on the desired










