Operation Manual

BASCV_EN
V03 | 07.2011
23
www.schaerer.comOperation
Milk
Option 1: Milk Smart
Have fresh, pre-cooled milk (3 – 5°C) ready.
Hang the hose or hoses into the milk.
The hose end must be in contact with the container floor.
Option 2: Additional cooling unit
Open the door.
Remove and rinse the milk container.
Fill in fresh, pre-cooled milk (3 – 5°C).
Place the milk container into the cooling unit.
Hang the hose or hoses into the container.
The hose end must be in contact with the container floor.
Close the door.
Option 3: Internal cooling unit
Remove the left-hand door or cover.
Remove and rinse the milk container.
Fill in fresh, pre-cooled milk (3 – 5°C).
Place the milk container into the cooling unit.
Hang the hose or hoses into the container.
The hose end must be in contact with the container floor.
Close the door or cover.
Option 4: Cup & Cool
Open the door.
Pull the milk hose adapter out of the lid.
Push on the desired milk nozzle (1 mm - 1.7 mm), if not already available, between the
hose and the adapter.
Remove and rinse the milk container.
Fill in fresh, pre-cooled milk (3 – 5°C).
Place the milk container back in the cooling unit.
Push the hose adapter back into the lid.
Close the door.
No more than 40 cm should be between the milk package and the beverage outlet.
See also "Safety notes" - "Hygiene" - "Milk".
See "Installation and commissioning" - "Connecting the milk supply" for further specifications
on milk nozzles.