Operation Manual

BASCV_EN
V03 | 07.2011
21
www.schaerer.comInstallation and commissioning
Deinstallation and disposal
The coffee machine must be disposed of correctly in conformity with local and legal regula-
tions.
Contact service partner.
Cup fill volume
Option 1: "NO"
The commissioning program
is completed. The coffee ma-
chine is now ready to use.
Option 2: "YES"
Select the button "YES".
Select the beverage button (pay
attention to the level selected).
Perform the setting with the
buttons.
Check the fill volume as required
with the button .
Confirm the setting with "OK".
Repeat the procedure with the
other buttons.
Operational readiness of the
coffee machine is displayed.
50% - 150% The cup fill volume can also
be set at a later time.
See "Programming" - "Set-
tings menu"
The display switches over
automatically to operational
readiness.
Display/ display text Parameter description Setting range Notes