Information about the system filling
and heating-up phase:
The system is filled and heat-
ed up.
Touch "Continue".
The next commissioning
step appears.
"Continue" During the heating-up pha-
se the thermostat symbol
flashes.
The heating-up phase
takes ca. 5 minutes to
reach working temperature.
Filling the containers:
Fill with milk.
Connect/fill with milk.
Confirm by touching .
The next commissioning
step appears.
- Optionally various milk sys-
tems are possible.
See "Operation" - "Filling
and connecting" - "Milk"
Fill with choco powder.
Fill with choco powder
Confirm by touching .
The next commissioning
step appears.
- Optionally, various powder
systems are possible.
See "Operation" - "Filling
and connecting" - "Machine
powder"
Fill with espresso beans.
Pour the espresso beans into
the right-hand bean hopper.
Confirm by touching .
The next commissioning
step appears.
- The right-hand bean hop-
per is reserved for espres-
so.
Fill with coffee beans.
Pour the coffee beans into the
left-hand or middle bean hopper.
Confirm by touching .
The next commissioning
step appears.
- The left-hand or middle
bean hopper is reserved for
coffee beans.
Information about the second bever-
age button level
- Optionally the buttons have
double assignments. The
possible button selection is
"top" or "bottom".
Selection of the beverage button le-
vel:
Change to 2nd level .
The level changes. The new
level is displayed.
"Top" level
"Bottom" level
See "Operation - Operating
options" to deactivate this
function.
Display/ display text Parameter description Setting range Notes