Operating instructions

www.schaerer.com Operation
BASCP_EN
V02 | 09.2011
18
Option 1: Choco
Pour in the desired choco powder.
Option 2: Topping
Pour in the desired milk powder.
Milk (Option)
Option 1: Milk Smart
Have fresh, pre-cooled milk (3 – 5°C) ready.
Hang the hose or hoses into the milk.
The hose end must be in contact with the container floor.
Option 2: Additional cooling unit
Open the door.
Remove and rinse the milk container.
Fill in fresh, pre-cooled milk (3 – 5°C).
Place the milk container into the cooling unit.
Hang the hose or hoses into the container.
The hose end must be in contact with the container floor.
Close the door.
Dispensing
Adjusting the cup grate
When large containers are used, such as a latte macchiato glass, the cup grate must be shifted
to the right.
Grasp the cup grate, push it to the right and let it engage.
Place the cup on the cup grate.
Beverages
Place a cup under the beverage outlet.
CAUTION!
Hot fluid!
Press the required beverage button.
The progress of the beverage dispensing will be shown on the main screen.
Remove the cup after the beverage has been dispensed.
No more than 40 cm should be between the milk package and the beverage outlet.
See also "Safety notes" - "Hygiene" - "Milk".
See "Dispensing options" - "Stop dispensing" to stop dispensing of the beverage.