Operating instructions
www.schaerer.com Operation
BASCP_EN
V02 | 09.2011
18
Option 1: Choco
► Pour in the desired choco powder.
Option 2: Topping
► Pour in the desired milk powder.
Milk (Option)
Option 1: Milk Smart
► Have fresh, pre-cooled milk (3 – 5°C) ready.
► Hang the hose or hoses into the milk.
The hose end must be in contact with the container floor.
Option 2: Additional cooling unit
► Open the door.
► Remove and rinse the milk container.
► Fill in fresh, pre-cooled milk (3 – 5°C).
► Place the milk container into the cooling unit.
► Hang the hose or hoses into the container.
The hose end must be in contact with the container floor.
► Close the door.
Dispensing
Adjusting the cup grate
When large containers are used, such as a latte macchiato glass, the cup grate must be shifted
to the right.
► Grasp the cup grate, push it to the right and let it engage.
► Place the cup on the cup grate.
Beverages
► Place a cup under the beverage outlet.
CAUTION!
Hot fluid!
► Press the required beverage button.
The progress of the beverage dispensing will be shown on the main screen.
► Remove the cup after the beverage has been dispensed.
No more than 40 cm should be between the milk package and the beverage outlet.
See also "Safety notes" - "Hygiene" - "Milk".
See "Dispensing options" - "Stop dispensing" to stop dispensing of the beverage.