Operating instructions
BASCP_EN
V02 | 09.2011
13
www.schaerer.comInstallation and commissioning
Installation
Unpacking the machine
► Unpack the machine.
► Check the remaining package contents for accessories.
► Remove the accessories supplied in the grounds container and water tank.
► Keep the original packaging in case the equipment needs to be sent back.
Automatic commissioning program
► Connect the coffee machine to the mains power supply.
► Switch on the coffee machine.
The commissioning program automatically starts the first time the machine is switched
on. It explains all aspects of installation.
Deinstallation and disposal
The coffee machine must be disposed of correctly in conformity with local and legal regula-
tions.
► Contact service partner.
Read the “Setting up the coffee machine” and “Power supply” chapters carefully before install-
ing.