Operating instructions

www.schaerer.com Operation
BASCJ_EN
V01 | 02.2011
16
Remove and rinse the milk container.
Fill in fresh, pre-cooled milk (3 – 5°C).
Place the milk container into the cooling unit.
Hang the hose or hoses into the container.
The hose end must be in contact with the container floor.
Close the door.
Switching on
Press the button.
The coffee machine switches on and the greeting message appears on the display.
Place a container under the beverage outlet.
The coffee machine begins heating up.
After heating up, the coffee machine performs a coffee system rinse (duration:
ca. 40 sec).
Option: Additional cooling unit
Connect the additional cooling unit to the line supply.
Set the rocker switch on the rear of the additional cooling unit to "COLD".
The additional cooling unit switches on.
Dispensing
Preheating cups
A storage area for cups is located on top of the coffee machine. When the machine is switched
on, the storage area is heated and the cups are prewarmed.
Place the cups on the storage area.
The cups are pre-warmed when the coffee machine is switched on.
Adjusting outlets
CAUTION!
Hot surface!
Hot surfaces can cause burns.
Exercise care when moving the beverage outlet.
Place a cup under the beverage outlet.
Grasp the beverage outlet from the front and slide it into the correct position (see figure).
Remove the cup after the beverage has been dispensed.
See "Operation" - "Fill and connect" - "Milk" - "Option: additional cooling unit".
Adjustable height = 70 – 135 mm.