Technical data

www.schaerer.com4. System test / calibration
Programming manual / V01 / 02.2010
35 / 62
Parameter / Menu Procedure Explanations & Remarks
4.11. Drain system
Do you want to start the drainage
process?
Yes
No
Start system drainage:
Exchange the mains water supply with clean compressed
air supply (0.3 MPa (3 bar)).
Press “Yes” to start the system drainage.
After the drainage process remove the boilers and empty
them manually.
Do not start system drainage:
Press “No” to return to the previous menu.
The drainage is used when de-installing
the machine or when the machine is
transported by temperatures under
degrees (e.g. transport by plane, etc.).
When switching on the machine after
the drainage the system will start with
the lling process.
Make the system pressureless (for maintenance and
repairs in the water circuit):
Press “Yes” to start the system drainage.
The longer the process is active the cooler the ;
system will be.
Close the mains water supply after approx. 1 minute.
Disconnect the machine from the mains power supply.