User Manual
ManualsBrandsScanomat ManualsCommercial Beverage Equipment1558usver15.06 TopBrewer Pro Coffee System with 2 High Volume 64mm Pro Flat-burr Grinders, 6.9 kW Heating Power, Pro Vane Pump, Swam Neck, Drip-Tray Flush Mounted, Drain Plug, Welcome Kit with Cleaning Tablets and Accessories, Drain Required, 1 Phase 208-
Users / service manual for Scanomat TopBrewer Pro
!
Service and repair is only to be carried out by service engineers educated by Scanomat.
The coffee brewer is to be secured additionally in accordance with regulations.
The coffee brewer must be earth connected (yellow/green conductor).
Note:
If the supply cable (power cord) has been damaged, please note that only a maintenance engineer
recommended by the manufacturer is to renew it, as special tools are required.
Earth conductor: yellow/green
Neutral conductor: blue
Phase: brown/black
Note:
Vibe Allé 3 • Postboks 131 • 2980 Kokkedal.
Phone +45 49 18 18 00 • Telefax +45 49 18 01 18
!11