Installation Manual

UNIT DETAILS
TopBrewer Pro ICE-Bank (A1)* Pro-fridge (A2) Pro-fridge Tall (A3) Cooler 45 (B1)* Pro-Fridge BiB (A4) Slimrack (C1) Chocolate rack (C2)
Installation Dimensions
(WxDxH)
224 x 560 x 667 mm 236 x 569 x 428.5 mm 231 x 600 x 430 mm 231 x 438 x 600 mm 255 x 464 x 404 mm 520 x 560 x 760 mm 129 x 428 x 476,5 mm 230 x 323 x 237 mm
Packing Dimensions
(WxDxH)
320 x 660 x 790 mm 246 x 579 x 488.5 mm 300 x 615 x 490 mm 241 x 443 x 660 mm 265 x 483 x 464 mm 530 x 575 x 820 mm 139 x 443 x 536,5 mm 240 x 338 x 297 mm
Weight, gross.
60 kg 25 kg 20 kg 20 kg 22 kg 31 kg 9 kg 8 kg
Weight, net.
56 kg 22 kg 17 kg 17 kg 19 kg 28 kg 6 kg 5 kg
Bean/Carton Capacity
2 x 1.4 kg Up to 4 l. Up to 9 l. Up to 9 l. -
3x 10 l. Bag-in-box
(up to)
10 l. Bag-in-box 3 l. Bag-in-box
Throughput/hour
180 cups Up to 4 L - - Up to 45 L - - -
Approvals
CE, ETL/UL, CB, NSF CE CE, ETL/UL CE, ETL/UL CE, ETL/UL, NSF CE, ETL/UL CE CE
Power
EU, 6900 Watt
220-240V, 30 amp, single phase
OR
400V, 16 amp, 3-phase
220-240V, 10 Amp.
3-pin plug point for each unit.v
31V DC from TopBrewer
EU, 2300 Watt
(Priority Heating)
220-240V, 10 amp, single phase
Canada & USA
L6-30 twist lock plug
(supply male/female connections)
115V, 60 Hz, 10 Amp
Plug point for each unit.
United King-
dom
32 Amp - Commando fitting
(supply male/female connections)
1 x 10 Amp single phase
(Priority heating)
115V, 60 Hz, 10 Amp
Plug point for each unit.
Water
Direct Water Connection, 3/4” type shuto valve
Water pressure: 200kPa (2 Bar) - 600 kPa (6 Bar)
- -
Direct Water Connection, 3/4”
type shuto valve
Water pressure: 200kPa (2 Bar) -
600 kPa (6 Bar)
- - -
Filtration
TopBrewer water filters fitted in a location adjacent to the
TopBrewer. See plumbing section. Dedicated steam filter
required (Pure 50, 0% bypass)
TopBrewer ActiveCoal
10.000, optional, purifies the
water with active coal
- -
TopBrewer ActiveCoal 10.000,
optional, purifies the water
with active coal technology.
- - -
Drainage
Waste U-pipe, ø40mm. Manifold/drain plug (included, see Plumbing section) is inserted and components are connected here.
Ventilation
Duct Fan Ventilation required. Cooler produces a lot of heat, which needs to be able to exit as per installation instructions in Carpenter section
Products Overview
TB A1
A2
A3
B1 A4C1C2
Fridges
Water coolers
Racks
* OPTIONALLY WITH CO
2