Instructions / Assembly
5
© - Copyright Scalewatcher North America Inc, Oxford, PA, USA. All rights reserved.
Scalewatchers are manufactured by Scalewatcher North America Inc, Scalewatcher (Thailand) Co. LTD, Scalewatcher Vietnam
and B & D Ingenieursburo BV in The Netherlands.
English
Image 1 Image 2
Image 3
Image 4
Example of wrong wrapping
Unroll the cable and secure the middle of the cable to the pipe with a cable tie. Do not
cut the cable in half! (Image 1). Make 18 windings with one half of the cable, starting
at the vertical arrow of image 2. The horizontal arrow gives the winding direction.
Secure the last winding with a cable tie. Start winding the second half of the cable on
top of the first layer with 18 windings going back, following the direction of the cable
(image 3), in such a way, that when done both cable ends are on opposite sides of the
pipe and on one side of the coil. (Image 4). Secure again with a cable tie. Cut the cable
to appropriate length to reach the location where you will mount the energizing unit and
remove 0.2" (0.5 cm) of the insulation of both cable ends. Insert the cable ends in the
spring connector, polarity is not important.
Installing the coil
Do not cut the cable in two parts