Third Party Verification Claim

Figure 1: Scalesweeper Effect on Scale Formation
450
400
350
300
250
200
150
100
50
0
-
-
-
-
-
-
-
-
0 5 10 15 20 25
| | | |
SCALESWEEPER ON
SCALESWEEPER OFF
TH (ppm)
TIME (h)
Note on Figure 1: Two 24-hour tests were conducted to prove Scalesweeper’s effectiveness in reducing scale formation in pipe
systems. With Scalesweeper turned off (the red line) shows total hardness measured in the recirculated water reduces dramati-
cally. This is due to hard scale coming out of the water and attaching to the pipes as pictured. With Scalesweeper turned on (the
blue line) shows no change in hardness as the scale is not forming on the pipe as shown in photo.
Figure 2: Scalesweeper Effect on Scale Reduction
450
400
350
300
250
200
150
100
50
0
-
-
-
-
-
-
-
-
0 4 8 12 16 20 24 28 32 36 40 44 48 52
| | | | | | | | | | | |
SCALESWEEPER ON
SCALESWEEPER OFF
TH (ppm)
TIME (h)
Note on Figure 2: A 48-hour test was conducted to test Scalesweeper’s effectiveness on scale reduction. With Scalesweeper
turned off for the first 24 hours, the red line shows hardness dropping due to hard scale coming out of the water and forming on
the pipe as in figure 1. After 24 hours, the Scalesweeper is turned on and the blue line shows an increase in the total hardness of
the water because scale is being pulled off the pipe and back into the water.
INRS – SCALESWEEPER PRODUCT PERFORMANCE TEST DATA 4
SCALESWEEPER ON
SCALESWEEPER ON