Installation guide
Efficient Networks, Inc.
5260 Front Panel
7
5260 Front Panel
The 5260 is equipped with four LEDs on the front panel: the System LED
(sys), ATM LED (atm), DSL LED (dsl), and Ethernet LED (enet).
1 First, the sys LED will come on. It turns solid green when the unit
has finished passing diagnostic tests.
2 The enet LED will then begin to flash green when Ethernet traffic is
detected.
3 The 5260 will begin negotiation of the optimum transmission rate and
attempt to train the line at the highest rate available. This process
usually only takes a minute, but if renegotiation of data rates is
necessary, it may take several minutes during which time the 5260 is
not yet operational.
4 While the unit negotiates the DSL line rate, the DSL LED will blink
yellow/green alternately. The LED will turn solid green when a link is
established.
5 The dsl LED will show solid green when it is ready to transmit data.
The atm LED will flash green indicating traffic flow on the WAN
interface.
sys atm dsl enet
SpeedStream