Assembly Instructions
13
11. Install the right side burner table
Line up the holes in the right side table (part 15) with the pre-installed screws on right
side of firebox and hood assembly. Slide right side table into place over the screws.
Tighten the pre-installed screws to secure the side table.
12. Install the knob bezel and side burner gas line
As shown in figure below, line up the holes in the side burner valve bracket to the
holes in the back side of the right side table front panel. Hold in place with one hand.
On the front side of the side table front panel line up the holes of the bezel (part 16)
with the holes in the front panel. Hold the bezel with the thumb of the hand holding the
side burner valve in place. Using free hand insert M4x8 screws into holes in bezel
securing bezel and side burner control valve. Tighten screws.










