Service manual
17. Place the development unit in the development unit installation
position and check the amount of used developer [A] in the developer
collection bottle/supply funnel ass’y [B].
18. If the used developer has reached the fill line [C] the developer must be
emptied. If the developer has not reached the fill line, return the
development unit to the development unit placement position and
continue to collect the developer.
19. Place the development unit in the development unit installation
position. Remove the developer collection bottle/supply funnel ass’y [D],
and put it in a developer collection bag.
20. With the development unit in the development unit installation
position, turn the revolver counterclockwise (as viewed from the hopper)
and supply new developer of the same color as the collected developer
(see chapter 3. COPIER INSTALLATION PROCEDURE).
[B]
[C]
[A]
[B]
[D]
Replacement
and
Adjustment
DEVELOPMENT UNIT
SM 5-43 A166/A187/A189
CÓPIA NÃO CONTROLADA
CÓPIA NÃO CONTROLADA










