Service manual

T
echnical
B
ulletin
PAGE: 3/15
Model:
Bellini-C2 Date: 4-Feb-04 No.: RB070038
4) Setting Powder (P/N 54429101) for the new C2e drum:
This drum surface setting powder should be applied whenever installing the service
parts C2e drum in the field. Please be sure to see pg. 2 of RTB #RA294064 for the
application procedure and related notes.
5) Installing the new C2e drum on Bellini-C2 MIF:
The following is the procedure for installing the new C2e drum on C2 mainframes in
the field, but please note that this drum cannot be installed on the C1.
a) Apply the setting powder to the new drum and complete the replacement in
accordance with the procedure and important notes in RTB #RA294064.
b) Change the following SP modes to the values shown below.
Change to:
SP No. Description
90cpm 105cpm
SP3903 VD Correction Counter 990 990
SP2301 Transfer Current Adjustment - -
-1 1st Copy Side 100 110
-2 Thick Paper 100 110
-4 Translucent Sheet 100 110
-5 2nd Copy Side 100 110
SP2940 Leading Edge Transfer Current - -
-1 Tray 1 100 110
-2 Tray 2 100 110
-3 Tray 3 100 110
-4 Tray 4 100 110
-5 Tray 5 100 110
-6 Tray 6 100 110
-7 Tray 7 100 110
-8 Duplex Tray 100 110
II. New Z-Folding Unit
1) Important Notes:
! To install the new Z-Folding Unit Type 2105 on the C2e mainframe, it is necessary to
first install the new 3000 Sheet Finisher (SR841).
! To install the unit on C2 MIF, in addition to the above, it is also necessary to update to
several specific firmware versions. These details will be announced as a re-issue of
this bulletin as soon as they become available.