User's Manual
Savi Tag ST-696-001 ISO Container Door Tag with GPRS/GPS and Sensors Installation Guide
8
Installing Savi Tag
ST-696-001 ISO
Container
Door Tag
Required Tools and Materials
Before you begin installation, make sure the following materials are available:
◆ Savi Tag ST-696-001 ISO Container Door Tag with GPS/GPRS
◆ SaviTag Write Cable STA-1030
◆ Wall Adapter (provided)
Tag commissioning with SaviTag
Write Cable STA-1030
You can commission Savi Tag ST-696-001 ISO Container Door Tag using SaviTag Write Cable STA-1030. You
can also commission a tag using Savi software that operates on a mobile device, such as the Intermec® 741G/A or
751G/A Mobile Computer with an attached Savi
®
Mobile Reader SMR-650. You can purchase the cable,
software, and mobile device separately.
WARNING!!!
The antenna used for GSM transmitter must be installed to provide a separation distance of
at least 20cm from all persons and must not be co-located or operating in conjunction with
any other antenna or transmitter to ensure compliance with FCC (and other, national) rf
exposure requirements.
Note: Savi Tag ST-696-001 ISO Container Door Tag is shipped from the factory with the battery at 50% charge.
Before you attempt to commission the tag, make sure the battery is fully charged. |
See “Charging the Tag Battery ” on page 11.