User's Manual Part 1
CHAPTER 2
Installing the Tag
12 Savi SensorTag ST-673 Installation Guide
Commissioning the Tag with a Savi Docking
Station and Docking Station Adapter
1. With the Savi EchoPoint label
right-side up, insert the
adapter into the docking
station until the adapter stops.
The adapter has a magnetic
contact that adheres to the
Savi Docking Station
SDS-2002 when fully
inserted.
2. Unplug the rubber cap
covering the write port on the
tag and ensure that the Savi
EchoPoint label on the tag is
upside down. Note the lit
Contact LED on the docking
station. The tag is ready for
commissioning.
3. Start the tag commissioning
application. When the tag
commissioning application
writes data to the tag, the
Data LED is lit.