Installation guide

INSTALLATION GUIDE
37
6.1 Equipment Specification
Consult Appendix C for LP 100R Equipment Specifications.
7.1 Equipment Installation Checklist Preparation
After completion of the installation, the Equipment Installation Checklist must be completed by the installer
and submitted for review.
The Equipment Installation Checklist can be found in Appendix H. After completion, remove the checklist
from this manual and immediately return to the specified address.
8.1 Paper Loading and Printing Test and Status Pages
1. If the installer is familiar with the procedures required to load paper and print test and status pages, he
or she should perform them now and then proceed to the LP 100R Operator's Guide, document
number 9855063, Chapter 3: Printer Operation for specific user configuration instructions.
2. If the installer is not familiar with these procedures, proceed to the LP 100R Operator's Guide,
Chapter 3: Printer Operation for instructions.