Installation guide
INSTALLATION GUIDE
36
5.12 Final Mechanical Check
1. After completing the installation, check the following mechanical functions.
■ Check the opening and closing of the Front Cover, Toner Bottle access cover and the
left Side Cover.
■ Check the Stacker Assembly for smooth operation.
■ Check the Tractor Assembly for smooth up and down movement.
■ Check the EP Drawer for smooth operation a well as perfect locking and releasing.
■ Check Suction Brake unit for proper operation.
■ Check Web Guide roller for proper forms tension.
■ Check Swing Guide for proper operation (Optional).
■ Check Burster Unit for proper operation.
5.13 Leveling the Printer
One (1) level and a 20 mm open-end wrench are required for this procedure.
1. Once a proper location has been found for the printer, the printer should then be secured and leveled
to the floor. The leveling feet at the base of the printer should be adjusted so that the lower surface of
the printer frame is 70 mm above the floor surface as shown in Figure 5-34.
Figure 5-34
70mm MIN.
LEVELING
FOOT