Installation guide

INSTALLATION GUIDE
16
5.2 Preparation of the Developer Unit
1. Open the front door and slide open the EP Drawer (Figure 5-3.)
Figure 5-3
2. Remove any pieces of tape and packing material from the EP Drawer (Figure 5-4).
Figure 5-4