Installation Guide

3. Place the products connected with water pipes in
the embedded pit.
Hot water
pipe
Cold water
pipe
Hot water
pipe
Cold water
pipe
Hot water
pipe
Cold water
pipe
4. Seal the gap between the product and the wall, and
flush the sundries in the water pipe through water.
2. Correctly connect the tap water entrance.
The maximum temperature of hot water must not
be higher than 80 ℃.
6. Finished
5. Install the decorative cover,water outlet connector
and handle.
1. Please remove the debris at the connection before
installation to avoid blocking or leakage.
Make sure the inner wall is flat with the main flat plan.
And prepare embedded products.
28
42
143
35 60 40
25
83 50 92
33
45
Unit:mm)
Mark the screw hole on the wall,
drill and install the main body of the faucet.
NOTICE: In the process of embedding the wall, please do not remove the protective kit to avoid damaging the copper sleeve.