Product data

5
Signum 3 Ex
Getting Started
Getting Started
Installing the Display and Control Unit
The following options are available for installing the display and control unit:
(the pictures depict the SIW*DCP model)
§ Fastening the display and control unit to the weighing platform:
§ Guide the display and control unit onto the retainer bracket
§ Level the weighing platform (see page 7)
Attached to the weighing platform
On the YDH01P column: optional for the DCP model
On the YDH02P column: optional for the BBP model
On the YDH0xCWS column: optional for the DCS model
On the YDH02S column: optional for the BBS model
Operating the display and control unit separately:
§ Turn the weighing platform over and place it on a soft surface to avoid damaging the
weighing system
§ Remove the display and control unit retainer bracket
§ Take the cable out of the cable channel
§ Turn the weighing platform right-side up and place it so that it rests on its feet
§ Level the weighing platform (see page 7)
Installing the display and control unit on the YDH01P column:
§ Turn the weighing platform over and place it on a soft surface to avoid damaging the
weighing system
§ Remove the display and control unit retainer bracket
§ Take the cable out of the cable channel
§ Use the four hexagonal screws provided (M4+8) to attach the column to the weighing
platform (back panel facing downward)
§ Turn the weighing platform right side up and place it so that it rests on its feet
§ Loosen the two locking bolts at the top of the column to facilitate installation of the
display and control unit
§ Use the three hexagonal screws (M4x8) to attach the display and control unit to the top
of the column
§ Adjust the display and control unit to the desired angle and secure it there
– This is done by tightening the locking bolts on the top of the column