Operating instructions

Care and Maintenance
Cubis MSE Operating Instructions 81
Transporting the Parts (Large Analytical Draft Shield)
t Get the box for the individual parts of the balance ready.
t Place the bottom foam piece in the box.
t Place the panels in the packaging:
1) Place the upper draft shield panel into the packaging (handle upwards).
2) Place the side draft shield panel into the packaging (handle upwards).
3) Place the other side panel into the packaging (handle downwards).
t Then place the top foam piece in the box.
1
2
3