Service manual

81
Repairing the Weighing Platforms
Replacing the Connecting Cable
If the connecting cable (from junction box to Combics indicator) needs to be
replaced on a weighing platform with four load cells, or if the load cell needs to be
replaced on a platform with only one load cell , open the Combics indicator and
disconnect the cable from the terminal strip of the A/D converter.
Unscrew the cable gland; the cable or load cell can now be replaced.
Remove the isolation and connect the new cable:
Expose approx. 6 cm (2.4 in.) of the wires (3) in the cable.
Remove the isolation from approx. 1 cm (0.5 in.) of the wires and affix ferrules
to the wire ends.
Thread the cable through the cable gland.
The shielding (1) must have contact with the clamps (2). Connection to ground
via the shield.
Make sure you install the required ferrite ring (see page 71).
After replacing the cable or load cell, use a torque wrench to tighten the cable
gland to 5 Nm.
Note: On stainless steel models, the IP67 protection must be checked after
closing the junction box.
pg9_04.tif
pg9_01.tif
fct01_23.eps