SAFETY INFORMATION caution Please carefully read the following Important safety Information before: handling or Installing this shower door. Hers is a risk of serious injury while handing this product. To minimize these risks, please note: Always wear safety glasses and gloves whi handing. Always follow the installation instructions. Inspect glass for damage before installation.
WARM RIFE vet en sss 1s wooed hope. FELON NOTE:Our shower door Is affixed with explosion-proof film. stall the side with th: pols! proof film prompt Inside the shower room. Ste pi: Measure dimensions and drill holes. Measure the size L of the bathroom to see if it matches the product size. 29.
Countermeasure dimensions and drill holes. 26x30mm Knock the wall anchor x8 into the hols. i Place the wall jambs ®x2 on both sides of the wall, adjust the level,and draw against the hole marks. Use a @6x30mm drill bit to drill the hole.
Preinstalled the entire frame into the shower room. 0, Lack the fixed panel @x1 N into the wall jambs ®x2. (Pay attention to the side with the red label facing Inward) Lock the guide rail fixings ® x2 and ST4x12 matrix screws @x2, adjust the level. Then put the entire frame Into the shower room according to the holes in step 1, then tighten tha decorative cover @x6 and $T4x30 metric screws @x6. [ A Install the round pipe single-head handle ®x1.
Preinstalled pulleys Into glass door panel, and hang It In the tall. yA Install the upper and lower pulleys on the = glass door panel @. I Adjustable Lift the glass and place the upper pulleys x2 inside the upper guide rail, then put the lower pulleys &x2 on the lower gulden tall, and Install the cover. Move the door to test whether it fits properly. {Note that the upper double pulleys can be adjusted up and down, and the lower double bounce pulleys can be pressed down.
‘Preinstalled waterproof strips and handles. Clip the fixed panel side ® water-blocking strip @x1 into the glass door panel @. Clip the side seal strip @x1 into the fixed panel ®. snl Eos =r Fal = Clip the magnetic seal strip @x1 into the glass door panel @x1, Insert @x1 and tap it tightly with rubber hammer. Install the glass door panel handle © x1.
Steeple and Install decorative cover. Cover the decor: cover of the positioning block ® x2, adjust the width and lock it. @3.2mm Dodoma bluet | gg a 3.2mm drill bit to drill holes. Lock @x6 and @x6 into the < mi — holes. Close the lid. Lock the upper and lower pulley decorative covers.
Stepladder 100% silicone sealant along the wall Jambs Inside and outside tha shower, and apply along the threshold outside the shower. Do not use the shower door within 24 hours. talon and do not use 1g the shower enclosure.
SHOWER DOOR MAINTENANCE MANUAL Cleaning: 1.When cleaning the farm, glass and hardware accessories of the shower door, please use a soft cloth. If thees is slight dirt, please use a soft cloth or sponge dipped in "neutral detergent® for cleaning. After removing the stubborn dit, please rinse with platy of water to prevent the cleaning agent from remaining on the surface of the shows door and causing corrosion damage.