Instruction Manual
7
6
The Sapling Company, Inc.
670 Louis Drive
Warminster, PA 18974
USA
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
9
Mounting a Zone Clock Pole
7) Skip this step if your clock is battery-powered. Consult your clock’s manual for
wiring instructions. If battery operated analog clocks are used, no wires are needed. Depending
on the clock model, you may need to run a network cable or electrical wires. If you are using an
IP-PoE clock, do not run more than four wires to each gang box. If you have more than three
IP-PoE clocks on the pole, run additional ethernet cables to the other gang boxes.
A
E
G
F
H
C
B
D
6) Insert the machine screws through the mounting plates and into the gang boxes, then insert
the self-tapping screws through the mounting plates and into the wall anchors.
Holes A, B, C, and D are meant for securing the base plate to a standard double gang (utility) box.
In addition, holes E, F, G, and H are meant for securing the base plate to the wall using an
additional four (4) screws, as shown in image A below.
Image A
4.49 in
(114 mm)