User`s guide
The program pastes the identifying information from the destination object you selected in the source
report into the appropriate fields.
The Paste Link button includes a list of options that you can use when pasting a link to the destination
object. Depending on the type of link you are creating (for example, a link to a specific data context
rather than a link to a generic data context), you may see these options:
• Context Report Part
This is the default option; it is selected when you click Paste Link without viewing the other list
options. Use this option to paste a link that includes the most complete data context that the
program can determine. For more information, see Context Report Part option scenarios.
• Design View Report Part
Use this option to paste a link that includes a generic data context (that is, a data context that
does not point to a specific record). Use this option when you want a broad data context, or when
data is not yet present in your source report.
• Preview Report Part
Use this option to paste a link that includes a specific data context (that is, a data context that
points to a specific record). Use this option when you want a narrow data context, or when data
is present in your source report.
2012-03-14401
Printing, Exporting, and Viewing Reports