Install Instructions
Step 3. Determine the placement of the unit and
turn / screw your first eye bolt into position on the
bottom of the floor or rim joist. Use a screw driver
as leverage to tighten the eye bolt. Screw in until the
threads are no longer visible.
Step 4: Distance the
second eye bolt 35"
away from the first eye
bolt on the same joist
and screw into place.
4201 Lien Rd Madison, WI 53704
•
TOLL-FREE 1-800-533-7533
•
www.thermastor.com
•
sales@thermastor.com
Step 5: Use the remaining two eye bolts on the
joist parallel to the joist used for the first two eye
bolts. Eye up the location of the remaining two
eye bolts and position them straight across from
the first two eye bolts used in steps 3 and 4. The
placement should be close but does not need to
be precise.
Be sure to keep 35” of space between the two
eye bolts on each joist.
Step 6: Position the
unit directly below the
eye bolts. Attach the
four ratchet straps to the
pre-drilled holes on the
hang kit brackets using
the non-ratchet clip end.
Step 7: Using the ratchet end of the ratchet strap,
attach each strap to the eye bolts above the unit.
If additional slack on the rope is needed, push the
trigger on the ratchet end of the strap up and feed
the rope through as needed.
Step 8: Pull down on the ratchet rope, lifting the
unit in place. We recommend pulling down on
each individual ratchet rope 6-12 inches at a time
until level.
CAUTION!
MOVING THE STRAPS TOO QUICKLY CAN
CAUSE THE UNIT TO ROCK AND TIP.
Simultaneously pull up
on the rope attached
to the unit and down
on the ratchet rope
for better results.