Install Instructions

Hang Kit
Part No. 4036685
Parts Included:
1. (4) Ratchet Straps
2. (2) Brackets
3. (4) Eye Bolts (3/8 x 3-7/8)
Tools Required:
• Tape Measure
• Level
Screw Driver (Phillips or Regular)
to use as leverage for Eye Bolts
Screws for TJI joists (only
applies if you have TJI joists)
Optional Tool:
Power Drill with 1/4" Drill Bit
(to pre-drill Eye Bolt holes)
1
2
3
CAUTION!
MAKE SURE THE UNIT IS LEVEL AFTER INSTALLATION.
4201 Lien Rd Madison, WI 53704
TOLL-FREE 1-800-533-7533
www.thermastor.com
sales@thermastor.com
TS-928 6/18 Rev B
OVER
Step 1: Gently tip the unit up on its back
end in order to have access to the bottom
foot holes.
Step 2: Secure the brackets in place by using the leveling feet and the
female threaded holes. (Leveling feet are packaged with the dehumidier.)
Line up the pre-drilled holes on the brackets with the leveling feet holes on
the unit. Once lined up, screw in the leveling feet to secure the brackets to
the dehumidier.
There are four leveling feet to screw in on each dehumidier.
Once in place, gently tip the unit back down on the leveling feet with the
brackets in place.
Standard Joist Instructions
[SEE PAGE 3 FOR TJI JOIST INSTRUCTIONS]

Summary of content (3 pages)