User Guide

7
800.533.7533 | Santa-Fe-Products.com Santa Fe ULTRA155/ULTRA205 Installation & Operation Instructions
The Santa Fe Dehumidier generates condensate.
Place a secondary drain pan with a oat switch under the dehumidier if it is suspended above a nished
area or above an area where water leakage could cause damage.
A drain trap is required for the dehumidier to drain properly. Install a 3/4" threaded male NPT adapter to the
drain pan. Install a drain pipe assembly utilizing 3/4" PVC pipe to transport the condensate to a drain. Pitch
of drain should be 1" per 10'.
An optional condensate pump kit is available for use with the Santa Fe Dehumidier and may be installed if
lift is required to dispose of condensate. Condensate is automatically pumped to a remote location when the
water level in the pump’s reservoir rises to close the oat switch.
The pump also contains a safety oat switch. The white leads from this switch extend from beneath the
pump cover. This switch should be installed in series with the eld wire that connects to the common lead
from the Santa Fe Dehumidier to the control panel. If the pump fails, this switch opens the common control
circuit and stops water production before the reservoir overows. Contact a qualied electrician to install the
safety oat switch to the Santa Fe Dehumidier.
Note: An optional condensate pump kit and an automatic cut-o device can be purchased through your
dealer or online.
DRAIN INSTALLATION
Drain Installation
Drain
Trap
Drain
Port
4035934
Drain Trap
Drain Port
Secondary Drain Pan
Drain
Trap
Drain
Port
4035934
Drain Trap
Drain Port
Secondary Drain Pan