Owner Manual

Rafter 36” Bathroom Vanity
Page 2 of 4
STEP 1
Place the vanity in the desired location.
Ensure the vanity is level. Shim legs, if necessary.
The drawers need to be removed to assist with plumbing installation and to secure the vanity to the wall. Locate
the plastic clips located on both sides of the bottom of the drawer. At the same time, press the right spring clip
downward and the left spring clip upward. Once both spring clips are held in the indicated position, pull the
drawer straight out.
Install the faucet and all plumbing.
Using the appropriate screws and wall anchors secure the vanity to the wall through the back rail panel of the
vanity.
Before installation, please check received items in below “Part List”. Please report any missing items to your
retailer immediately.
Part List
Part A - Vanity w/top 1 PC
Part B - Backsplash 1PC
Ensure there are no water leaks.
To reinsert the drawers, close completely both
drawer slides attached to the vanity. Move the
component of the slides with ball bearings to the
front of the slides, maintaining the slides completely
closed. Carefully line up the slides of the drawer box
with the slides in the base cabinet and close the
drawer all the way to the back. Open the drawer
completely to ensure it is properly installed.
Part C - Door
Part D - Hardware 2PCS
NOTES, ASSEMBLY AND INSTALLATION
Faucet, drain, silicone and all other plumbing components, tools & hardware are not included.
Handling will require two people.
Ensure the vanity is installed on a level floor. Unevenness can cause the vanity to become misaligned,
resulting in twisting of the cabinet. Repair any uneven areas with shims.
Ensure all building & plumbing codes are respected. Professional installation recommended.