Installation & Assembly
A
ASSEMBLY COMPLETED
STEP 7
I
Insert the 8 pieces JCBB SCREW (A) to combine the SIDE RAILS(i) and (ii)-(5)&(6) to the LEFT and RIGHT
HAEDBOARD SUPPORT(2)&(3) and the FOOTBOARD as shown.
13
G
Put the 4 pieces SLAT (13)-(combined with CENTRE SUPPORT LEG(14) in step 1) on the wood of SIDE RAILS(i) and
(ii)-(5)&(6).Then insert 8 pieces CSK C/B SCREW (G) to fix as shown.
ASSEMBLY INSTRUCTION
5
&
6
6
5
5
6
15
9
10
2
3
R
L
15
STEP 8
PAGE 9 OF 10
14
13










