Installation guide
Step
9.
Final
installation
checklist
You
have
just
completed
installing
your
range.
Make
sure
all
controls
are
in
the
off
position
and
the
flow
of
ventilation
air
to
the
range
is
unobstructed.
The
following
is
achecklist
to
confirm
your
range
is
safely
installed
and ready
for
operation.
-
Gas
line
has
been
properly
connected
to
the
range.
The
gas
has
been
turned
on.
All
connections
have
been
checked
for
leaks.
-
Range
is
plugged
into
the
properly
grounded
electrical
receptacle.
Gas
Range
Plug
-
Range
is
leveled
and
is
firmly
sitting
on
a
solid,
level
floor.
-
Gas
surface
burners
have
been
properly
assembled.
-
All
burners
have
been
tested
for
proper
operation.
-
FOR
INSTALLER
ONLY—Check
and/or
adjust
the
broil
and
oven
burner flames
as
described
on
page
37
in
this
manual.
36_
installation
instructions