User Manual

E-13
Time segmentation is used to divide 24 hours into different sections and to distribute
power according to each section.
This function is used when the power consumption fee is different according to
different time slots or when a building is charged differently depending on the
consumption time.
Time can be divided into 1 section (A), 2 sections (A,B,A), and 3 sections (A,B,C,B,A).
When the time is divided into 2 or 3 sections, you should install S-NET 3 to calculate or
check the distributed power on each section.
DMS2 will always show the result of the power distribution on section 1, regardless of
section 2 or 3.
Input manually (When setting 2 sections and 3 sections)
Time Segmentation
Main Function (Continued)
If communication error occurs between DMS and the lower level controllers,
actual power consumption and the result of power distribution value may not be
same. Make sure to solve communication error status.
- Communication error example : Between DMS2 and SIM/PIM
Between SIM/PIM and Watt-hour meter
Between DMS2 and Centralized controller
Between Centralized controller and interface
module
Between Interface module and indoor/outdoor
units Between DMS2 and interface module
MIM-D00A_DMS2_IB_E 32140-2.indd 13 2010-05-17 ソタタ・10:42:13