Service manual

Rev. 2.00
- 88 -
SRP-275
5-2-2 Main-assembly B
Part name Assembly procedure
Gear-RE_A
Ribbon-feeder ass’y
(Sub-assembly 5-1-2)
Gear-RE_C
Cover HF gear train
Lever-ribbon-feeder ass’y
Washer-plain (ø2.6) -2ea.
PCB-head ass’y
FPC-head
FPC-30pin
Screw-taptite (M3×4) -3ea.
Spring-lever-tension
Carriage head ass’y
(Sub-assembly 5-1-5)
Belt-round
1. Insert Gear-RE_A, Ribbon-feeder ass’y and Gear-
RE_C to three shafts of Frame-main.
2. Insert Cover HF gear train to two shafts.
3. Insert Lever-ribbon-feeder ass’y to two shafts and then
assemble two Washer-plain (ø2.6).
4. Insert FPC-head, FPC-30pin and the 2pin connector of
Solenoid to PCB-head ass’y and then tighten two Screw-
taptite (M3×4).
5. Assemble Spring-lever-tension between Lever-tension ass’y
and the hook of Frame-main.
6. Insert Carriage head ass’y to Belt-round and then
assemble Belt-round between Pulley and Assy-gear-pulley. And
tighten Lever-tension ass’y to Frame-main with Screw-taptite
(M3×4).
1
2
4
3
5
6
6
7
8
9
10
10
10
11
12
13