User Manual
PAGE 7 OF 8
SamsonRope.com | Email CustServ@SamsonRope.com | Tel +1.360.384.4669
Double Braid Class II Eye Splice Modified for TS-II Turbo
SAMSON SPLICING INSTRUCTIONS
Milk DC Gard cover down from
eye the toward working end.
Tape 6 inches tightly at the throat of splice and 12 inches at base of DC Gard cover.
Seize twine over taped area.
See page 189 for more information on seizing.
10G
10H
10 I
Milk down
6"
12"
Apply two-part urethane over seized area.
10 J
Finished seizing
Finished seizing
Finished splice
Begin tucking DC Gard strand groups over 2 strands and under 3 strands (1 tuck) and
complete 4 tucks. Bury the remaining length of strand groups between DC Gard cover and
rope a minimum of 1/2 a d length, trim DC Gard strand group ush with cover. Turn rope over
and repeat for the remaining strand group.
10F
1/2 fid length
Trim