Instructions / Assembly
19. Fasten wood pegs to cover the holes with nails. Match
the number or alphabet.
20. Fasten the loose lag bolts from sides (steps 7 and 8).
IMPORTANT:
It is EXTREMLY important
that you set each side of To-
rii LEVEL.
22. Pour mixed concrete into the holes and insert the poles.
Check the level and adjust the pole positions if it is not level.
23. Check the level from front or back. Adjust the pole
positions if not level.
24. Untie the strings to pull down the cement frames, place
them at the bottom, and finish the cement work. Remove
the wood board when the cement is cured.
21. Fasten wood pegs to cover the holes with nails. Match
the number or alphabet.