Little or no air flow and high humidity.
Exposed to steam, vapor, or water.
Exposed to direct cool air.
Near the television antenna or antenna cable.
Ventilation is not enough to cool the inverter, that is to say, outdoors, the inverter
requires. At least 30 cm (see table 2) of clearance among the units is needed, it is
recommended that the same clearance between the units and the ground be used.
Installing the inverter in the place mentioned above may cause the malfunction of the
Table 2 Available Space Size
system caused by water or high temperature inside the inverter. Please let users know that
Samil Power will not compensate the fault caused by the above situation.
6.3 Preparation
Below tools are needed before installation..
Installation Tools
Installation Tools: crimping pliers for binding post and RJ11, screwdriver and manual
wrench and ф 6 driller.
6.4 Installation Steps
Step1: Drill holes in the wall with ф 6 driller according to the size of bracket. Keep
drilling vertical to the wall, and don’t shake when drilling to avoid damage to the wall.
Position Min. Size
Side 30cm
Top 30cm
Bottom 30cm
Front 10cm