2.5 Commissioning
DANGER! WORK IN PROGRESS! DO NOT SWITCH!
It is not permissible to connect the ship’s mains to the system before setting-to-
work by a qualified and authorised person. The mains must be switched off (e.g.
by means of a common isolating switch or a circuit breaker) in the ship’s supply
or the mains cable must be disconnected until commissioning is carried out.