Installation & Assembly

Designer Locker Options
Installation Instructions
SALSBURY INDUSTRIES
1010 East 62
nd
Street, Los Angeles, CA 90001-1598
Phone: 1-800-562-5377 Int’l Phone: 323-846-6700
Fax: 1-800-562-5399 Int’l Fax: 323-846-6800
www.lockers.com engineering@lockers.com
Installation instructions are provided as general guidelines. It is advised that a professional installer be consulted. Salsbury Industries assumes no product assembly or installation liability.
Copyright © 2016 Salsbury Industries. All rights reserved. (Rev. 06, 08/17/2016) Page 6 of 8
Front Filler Fascia
Assemble the front filler fascia by placing color laminated piece in front of base piece, then connect the two pieces together using screws by drilling at
approximately a 75 degree downward angle. #8 x 1-1/4” long screws are provided for the installation.
Align front of fascia with front edge of compartment (not the front edge of the door). Install the front filler fascia by fastening it to the lockers by installing
screws from inside the lockers into the base of the front filler fascia. #8 x 1-1/4” long screws are provided for the installation.