Specifications
R
CHIEF 2000 HERTZ DC INVERTER WELDER
USERS MANUAL
Welding Of Studs, Nuts And Moulding Rivets
1. Fit appropriate electrode in the pistol. (See unit compo-
nents - page 2.)
2. Clamp ground shoe to steel sheet (panel, etc.) prior to
welding a stud, nut or moulding rivet to the steel sheet.
NOTE: When applying a pistol weld, the
ground shoe must be clamped to the steel sheet to
allow a flow of current through the component (stud,
nut or moulding rivet) and the steel sheet.
3. Select program and thickness of sheet to be welded.
NOTE: The power and welding time are preset and
parameters will automatically appear on the display.
If the preset parameters have been changed set
power and time according to the chart at right or
reset the timer as indicated on page 4 to recover the
original factory settings.
4. Position the electrode at the desired location. It must be
positioned perpendicular to the welding location to pre-
vent slippage. Apply moderate pressure for nut welding
and very low pressure for welding studs and moulding
rivets. Pull trigger to weld. The trigger can be released
at any time as welding is electronically controlled.
0.8mm 18 - 60 10 - 65 2 - 25
1.0mm 20 - 65 12 - 70 2 - 30
1.2mm 22 - 72 13 - 77 2 - 33
1.5mm 24 - 75 14 - 80 2 - 38
2.0mm 26 - 85 15 - 85 2 - 42
2.5mm 28 - 92 16 - 95 2 - 50
Basic Settings
Thickness
Tim.-Pow Tim.-Pow.
Tim.-Pow
All Steels
All Steels All Steels
8










