Instructions / Assembly

Gathering Tools and Materials
Before you begin, gather the required tools and components listed below and ensure all are
accounted for.
If any of the listed components in your packaging are missing, please call 877.655.3443 to have
them sent directly to you.
REQUIRED TOOLS:
Drill with 3/16” drill bit (capable of drilling 3” deep)
Socket Wrench set and/or open end wrench or
adjustable crescent wrench, socket drivers for drill
Rubber Mallet or Hammer
Flat Head Screwdriver
Tape Measure
Stud Finder (if installing on ceiling drywall)
Pencil or Pen
Sturdy Ladder
Safety Glasses
877.655.3443 www.eagleindustrialgroup.com Page 3
4’ x 8’ Unit:
8 Vertical Posts
2 48” Side Beams
2 96” C Channel Beams
1 48” Center Support
1 Hardware Bag
4 27” Ceiling Brackets
4 22.5” x 48” Wire Decking Units
4’ x 6’ Unit:
8 Vertical Posts
2 48” Side Beams
2 72” C Channel Beams
1 48” Center Support
1 Hardware Bag
4 27” Ceiling Brackets
3 22.5” x 48” Wire Decking Units
4’ x 4’ Unit:
8 Vertical Posts
4 48” Side Beams
1 Hardware Bag
4 27” Ceiling Brackets
2 22.5” x 48” Wire Decking Units
2’ x 8’ Unit:
8 Vertical Posts
2 24” Side Beams
2 96” C Channel Beams
1 24” Center Support
1 Hardware Bag
4 27” Ceiling Brackets
4 22.5” x 24” Wire Decking Units
3’ x 8’ Unit:
8 Vertical Posts
2 36” Side Beams
2 96” C Channel Beams
1 36” Center Support
1 Hardware Bag
4 27” Ceiling Brackets
4 22.5” x 36” Wire Decking Units
3’ x 6’ Unit:
8 Vertical Posts
2 36” Side Beams
2 72” C Channel Beams
1 36” Center Support
1 Hardware Bag
4 27” Ceiling Brackets
3 22.5” x 36” Wire Decking Units
2’ x 6’ Unit:
8 Vertical Posts
2 24” Side Beams
2 72” C Channel Beams
1 24” Center Support
1 Hardware Bag
4 27” Ceiling Brackets
3 22.5” x 24” Wire Decking Units
Hardware Bag (for all racks):
12 1/4”-20 Serrated Locking Nuts
12 1/4”-20 x 3/4” Hex Bolt (grade 5)
8 3” Lag Screw
32 5/16” Washer
4 10-24 Slot Head Bolt (not in 4x4)
4 10-24 Wing Nuts (not in 4x4)
COMPONENTS: (Pictures Available on Next Page)