Instructions / Assembly
Gathering Tools and Materials
• Before you begin, gather the required tools and components listed below and ensure all are
accounted for.
• If any of the listed components in your packaging are missing, please call 877.655.3443 to have
them sent directly to you.
REQUIRED TOOLS:
• Drill with 3/16” drill bit (capable of drilling 3” deep)
• Socket Wrench set and/or open end wrench or
adjustable crescent wrench, socket drivers for drill
• Rubber Mallet or Hammer
• Flat Head Screwdriver
• Tape Measure
• Stud Finder (if installing on ceiling drywall)
• Pencil or Pen
• Sturdy Ladder
• Safety Glasses
877.655.3443 www.eagleindustrialgroup.com Page 3
4’ x 8’ Unit:
8 Vertical Posts
2 48” Side Beams
2 96” C Channel Beams
1 48” Center Support
1 Hardware Bag
4 27” Ceiling Brackets
4 22.5” x 48” Wire Decking Units
4’ x 6’ Unit:
8 Vertical Posts
2 48” Side Beams
2 72” C Channel Beams
1 48” Center Support
1 Hardware Bag
4 27” Ceiling Brackets
3 22.5” x 48” Wire Decking Units
4’ x 4’ Unit:
8 Vertical Posts
4 48” Side Beams
1 Hardware Bag
4 27” Ceiling Brackets
2 22.5” x 48” Wire Decking Units
2’ x 8’ Unit:
8 Vertical Posts
2 24” Side Beams
2 96” C Channel Beams
1 24” Center Support
1 Hardware Bag
4 27” Ceiling Brackets
4 22.5” x 24” Wire Decking Units
3’ x 8’ Unit:
8 Vertical Posts
2 36” Side Beams
2 96” C Channel Beams
1 36” Center Support
1 Hardware Bag
4 27” Ceiling Brackets
4 22.5” x 36” Wire Decking Units
3’ x 6’ Unit:
8 Vertical Posts
2 36” Side Beams
2 72” C Channel Beams
1 36” Center Support
1 Hardware Bag
4 27” Ceiling Brackets
3 22.5” x 36” Wire Decking Units
2’ x 6’ Unit:
8 Vertical Posts
2 24” Side Beams
2 72” C Channel Beams
1 24” Center Support
1 Hardware Bag
4 27” Ceiling Brackets
3 22.5” x 24” Wire Decking Units
Hardware Bag (for all racks):
12 1/4”-20 Serrated Locking Nuts
12 1/4”-20 x 3/4” Hex Bolt (grade 5)
8 3” Lag Screw
32 5/16” Washer
4 10-24 Slot Head Bolt (not in 4x4)
4 10-24 Wing Nuts (not in 4x4)
COMPONENTS: (Pictures Available on Next Page)