Instructions / Assembly
Installation
Step 1
Unpack all parts from cartons carefully
Fixting nipple(D) to the pillar(B) and screw
with finial(F)
Fixting finial(G) to the shade(K
)and screw with
bolt(J)
Fixting shade(K) to the backplate(B) and screw
with screw pitch(I)
Place bulb(L) to the socket
Connect,Hot,Black or Red outlet Supply Wire to:
Connect,Neutral,White Outlet Supply Wire to:
Black
* Parallel Cord(round & smooth)
Clear,Brown,Gold or Blac
k without Tracer(colored stripes)
Insulated Wire(not green) with copper metal conductor
* Parallel Cord(square& ridged)
White
Clear,Brown,Gold or Black without Tracer(colored stripes)
Insulated Wire(not green) with Silver metal conductor
*Note: When parallel wire(SPTI & SPT II) is used.The neutral wire is square shaped
and ridged and the hot wire will be round in shape and smooth.(See illustration on lef
t.)
Step 2 Wire connection
Step 3
Installing the mounting bar(A) with mounting screw(A1),
and secure Backplate (B) with Backplate screw(C)
Step 4
Consult a qualified electrician to ensure
correct branch circuit conductor