Setup guide

If there is a # in front of device, leave it alone. If there is not a # in front of device, place one
there and save the file.
4. cd /usr/src
5. If you modified the MONTAGE file, enter:
make buildkernel KERNCONF=MONTAGE
If you modified the MONTAGESMP file, enter:
make buildkernel KERNCONF=MONTAGESMP
6. If you modified the MONTAGE file, enter:
make installkernel KERNCONF=MONTAGE
If you modified the MONTAGESMP file, enter:
make installkernel KERNCONF=MONTAGESMP
7. Reboot the server to initialize the new kernel.
8. After reboot, verify that the UPS is attached to ugen by entering:
dmesg | grep i ups
If the result indicates the UPS is attached to both ugen0 and uhid0, shut the machine down and
then power it on, and repeat this step.
Step II: Installing APC UPS Monitor
Have the customer perform the following steps:
1. Choose Primary Monitor Configuration (the SAFARI Montage server must be directly
connected to the APC UPS via USB).
2. Select the battery threshold at which the Monitor engages and powers down the server.
3. Click ‘Install APC UPS Monitor.’
The server is now configured to be the Primary Monitor, and will be powered down safely once
the battery level of the APC UPS reaches the Battery Threshold level.