User Manual

ionMig 200 PFC
Copyright © Mundaka Welding & Gases, Inc.
12
3.3 Equipment Connection
Operation Steps
1. Connect the power source input cable of welding machine with the output port of air switch in
electric box on the spot.
2. Connect the cable plug of wire feeder to the positive output of welding machine.
3. Connect the control cable plug of wire feeder to the aero socket on the front board of welding
machine.
4. Connect the negative pole of welding machine to the work piece (base metal).
5. Connect the output pipe of gas cylinder to the input joint of gas valve on the wire feeder and
clamp it.
6. Insert the torch joint into the output of wire feeder unit and keep the wire aim at the wire feeder
7. Connect the shielded gas pipe of torch with the output of front panel on wire feeder.