Install Manual
GRIPPERFIX™ Installation Instructions
5.
6.
5. Place condenser unit mounting holes over M8-1.25 x 40 
mm Bolts atop Damper Pads and Fix to 
GRIPPERFIX Rail: Some 
adjustment of the M8-1.25 x 40 mm Bolts & Damper Pads may 
be necessary to align with mounting holes of condenser unit. 
Additional Damper Pads can be added to the downslope 
mounting locations to level the condenser unit if necessary. 
Place the mounting holes on the feet of the condenser unit over 
the M8-1.25 x 40 mm bolts. Thread the M8-1.25 nuts onto the 
M8-1.25 x 40 mm Bolts (Fig. 5). Nuts should be torqued to 18 Nm 
(160 in lbs). 
6. Fasten downslope 
GRIPPERFIX Rail to the roof ribs: Secure 
the two downslope S-5-Tab EF directly into the top of the 
roof prole by driving the piercing fasteners into the two pre-
punched holes of each tab. Drive the fastener in until it is tight 
and the washer is rmly seated (Fig. 6). Do not over-drive 
fasteners; a slight extrusion of rubber around the washer is a 
good visual-tightness check. 
S-5!® Warning! Please use this product responsibly!
Products are protected by multiple U.S. and foreign patents. For published data regarding holding strength, fastener torque, patents, and trademarks, visit the S-5! website at www. S-5.com.
Copyright 2018, Metal Roof Innovations, Ltd. S-5! products are patent protected. S-5! aggressively protects its patents, trademarks, and copyrights. 
gRF-V1.0_062718




