Unit installation

11
11. CHECKOUT
1.
Before engaging power to any system, ensure the
following:
A) All tools have been removed from the
equipment.
B) All wiring is attached, routed and properly
secured.
C) All panels (both mechanical and electrical)
are in place.
D) The thermostat system switch is placed into
the “OFF” position.
E) All co-workers have been warned that the
equipment is being energized.
2. System wiring may be checked by referring to the
wiring diagram located on the back of the wiring box
door.
3. Before beginning the check-out procedure,
thoroughly read the check-out instructions in either
the thermostat installation instructions or in the
owners manual provided with this product.
Keep in mind that the wall thermostat provides a
3 minute delay between off and on cycles. A 2.5
minute delay begins both as soon as the compressor
cycles off, and as soon as the thermostat becomes
energized. After completion of the 2.5 minute delay,
an additional 30 second delay will begin as soon as
the thermostat demands cooling.
There is also a 30 second delay between 1st and 2nd
stage cooling. This is to prevent both compressors
from starting simultaneously. To ensure that the
thermostat calls for 1st and 2nd stage cooling, verify
that the cool setpoint is well below actual indoor
temperature.
4. After complying with steps 1 through 3, engage
power to all systems and begin check-out procedure.
5. Test each thermostat function such as fan modes,
heat modes and cool modes to insure proper
operation.